Describe two ways in which water supplies can be polluted.
- (a)(i)Describe two ways in which water supplies can be polluted.[2]
- (a)(ii)For one of these ways explain how the problem caused by pollution can be solved.[2]
- (b)Study Fig. 1, a map showing the major rivers of Pakistan. [Figure 1]
- (b)(i)Locate the following two dams on the map: Warsak (W); Diamir Bhasha (under construction) (D). This dam is 150km downstream of Gilgit. Mark their positions using the appropriate symbol from the key and label each with the correct letter.[2]
- (b)(ii)What are the advantages of building a dam at the Diamir Bhasha site?[4]
- (b)(iii)Read the following article about the proposal to build a new dam, the Kalabagh, on the River Indus at the point indicated on the map, Fig. 1. Kalabagh Dam – A Controversial Issue Punjab wants the Kalabagh Dam to be built, but there is opposition to the project from a section of the population in Sindh, Khyber Pakhtunkhwa and Balochistan. Those who are opposed to the dam argue that it might be beneficial for Punjab and harmful for the other provinces. The Kalabagh Dam issue is difficult to resolve at this stage. Describe the disputes over water availability and use which can arise from proposals to build dams at sites such as this.[4]
- (c)Study Photographs A and B (Insert), which show typical scenes of deforestation. [Photographs A and B]
- (c)(i)State one use of timber from forests that have been cut down.[1]
- (c)(ii)Using the photographs and your own knowledge, describe the effects of deforestation on the natural environment.[4]
- (d)Pakistan is rapidly losing its trees. Over the period 2000–2007 the country's forests decreased at a rate of 2.2% per year, the ninth highest rate among the world's nations. What actions can be taken to reduce deforestation? To what extent are these actions possible in Pakistan?[6]
This question uses a diagram from the original paper, which isn't shown here. Open the full paper from the past papers archive to see it.
Mark scheme
Marking points from the official mark scheme (Oct/Nov 2015). The mark or mark type is shown in brackets.
- Sewage discharged into rivers
- Domestic waste thrown in rivers
- Pesticides/fertilisers runoff from agricultural fields in groundwater/rivers/eutrophication
- Industrial waste/chemicals/toxic waste/metals/ waste from ships discharged into rivers
- Leakage of oil from ships
- 'Sea'/'ocean' = 0
- Investment in sewerage systems/ infrastructure/treatment of sewage
- Improve sanitation facilities in poor quality housing/slums/squatter settlements /katchi abadis
- Improve/more regular domestic refuse collection
- Treatment of/improving disposal of industrial waste
- Open up roads into squatter settlements to allow refuse lorries
- Alternatives to chemical fertilisers/pesticides 'Reduce' = 0
- Organic farming
- Fines for industrial polluters
- More investment by industries to prevent pollution incidents
- Maintenance of ship/checking for leaks in ship
- If not clearly linked to candidate answer/different answer to (i) then max 1
- W On R. Kabul between confluence with R.Swat and Afghan border RED OVERLAY SHOWS TOLERANCE
- D On R. Indus GREEN OVERLAY SHOWS TOLERANCE
- Credit any indication of correct location on map within tolerated regions
- 1 + 1 mark
- HEP
- Electrification of/supplies electricity to the region/for local industries
- Only floods agriculturally barren land/small amount agricultural land flooded
- Will extend life of Tarbela Dam
- Controls/reduces/prevents flooding [downstream]
- For irrigation
- Drinking water/water supply for industries
- New transport infrastructure/development in region
- Possibility of tourism/watersports
- Possibility of freshwater fishing
- Provides employment in named sector /for local people
- Location factor e.g. narrow/steep-sided valley/high speed of water/high precipitation/large amount of meltwater from glaciers ‘Flow' = 0
- One province receives greater share of water/unequal division of water
- Dam in Punjab/one province but much of flooded area in Khyber Pakhtunkhwa/another province
- Loss of water supply downstream/to Sindh for agriculture
- Risk of flooding downstream by release of water/opening dam
- Less silt deposited on floodplains of lower course/lower Indus
- Evaporation of lower course/lower Indus
- [Indus] delta/coastal area [of Sindh] less fresh water/water more saline
- Disturbance to ecosystem/mangrove forests/fishing
- NB: not limited to Kalabagh case study
- 'Loss of land'/'evacuation' = 0
- Construction/buildings
- Furniture
- Sports goods
- Chipboard/hardboard/plywood
- Paper
- Boxes
- Matches
- Fuel/firewood/charcoal
- Veneer
- USE LIST RULE
- Soil washed into rivers
- Siltation of rivers
- Soil blown away
- Increased surface run off / risk of flooding
- Loss of forest habitat/mangroves/ecosystem
- Loss of species/extinction
- Air pollution from burning
- Less take up of CO2 / increase in global warming/climate change
- Soil eroded / coarse layers of soil/bare rock/infertile soil left behind / gullying / landslides
- Less transpiration/rainfall
- Decrease in humus formation
- Loss of scenic beauty/visual pollution
- Government protection of forest areas/national parks/reserves
- Sustainable forestry (selective cutting/helilogging/horse logging)
- Planting trees/afforestation/reafforestation (of fast growing trees/replacement forests planted where areas cleared for housing/industry/roads)
- Plantation (of commercial/irrigated forests/forests for firewood/planting on roadsides and open spaces/fruit/nut trees)
- Improve distribution of alternative fuel sources to avoid need for fuelwood (e.g. natural gas/CNG to mountainous or remote areas)
- Government action on illegal logging
- Restrict logging (quotas/licences)
- Education/awareness programmes
- Successful afforestation projects (of badlands in catchment areas) (Tarbela/Mangla Watershed Project) (Rachna Doab Afforestation Project) (Baltistan 1995 onwards afforestation programme by Agha Khan Rural Support Programme – 830000 trees planted)
- Named forest reserves/national parks/plantations
- Awareness programmes about value of forests (run by NGOs)
- High cost
- Projects difficult to manage (in remote/mountainous areas)
- Security issues (in FATA/border areas)
- Growing population/demand for timber/firewood/land (for housing, industry, agriculture, roads)
- Government priorities
Write your answer and get it marked
On Oracle Prep you can write or photograph your own answer and have it marked by AI against this mark scheme, with feedback on what you missed.
Sign up free →