Skip to main content
O-LevelPakistan StudiesThe environment of Pakistan2059/20 · Oct/Nov 2014 · Q225 Marks

(a) Explain what is meant by each of the following terms, and choose one example of each from the given list. A raw material example B waste material example C value added material example COAL COKE STEEL SLAG LIMESTONE CO2

  1. (a)Explain what is meant by each of the following terms, and choose one example of each from the given list. A raw material example B waste material example C value added material example COAL COKE STEEL SLAG LIMESTONE CO2[6]
  2. (b)(i)Study Fig. 2, a map of the site of the Pakistan Steel Mills. Name the creek X and the port Y. X Y[2]
  3. (b)(ii)Name the sea to the south where ships can travel to the steel mills.[1]
  4. (b)(iii)Using Fig. 2 and your own knowledge, state three factors that make this site suitable for the development of the Pakistan Steel Mills. Explain one advantage that each factor gives to this industry.[6]
  5. (c)Explain why the Pakistan Steel Mills is an industry in the 'formal sector'.[4]
  6. (d)To what extent can work in the informal sector improve the lives of those living in urban areas? Explain your answer.[6]

This question uses a diagram from the original paper, which isn't shown here. Open the full paper from the past papers archive to see it.

Mark scheme

Marking points from the official mark scheme (Oct/Nov 2014). The mark or mark type is shown in brackets.

  1. [1] (A definition) Basic commodity from which finished goods are made / which is changed by a manufacturing process
  2. [1] (A example) Coal / limestone
  3. [1] (B definition) Unused / unwanted by-product
  4. [1] (B example) Slag / CO2
  5. [1] (C definition) Product that increases in value / worth due to industrial activities / a material improved as it goes through a manufacturing process
  6. [1] (C example) Steel / coke
  7. [1] X Gharo
  8. [1] Y Port[Bin] Qasim
  9. [1] Arabian [Sea]
  10. [1] (Factor) Flat / cheap / unused land
  11. [1] (Advantage) Low set-up cost
  12. [1] (Factor) Coastal site / natural / deep water harbour
  13. [1] (Advantage) Allows transport by ship / of heavy / bulky materials; Cheap transport of raw materials
  14. [1] (Factor) Limestone nearby / at Thatta / Murli Hills
  15. [1] (Advantage) Cheap transport of raw materials
  16. [1] (Factor) Fresh water nearby / at Lake Haleji
  17. [1] (Advantage) Reliable / continuous water supply
  18. [1] (Factor) Power stations nearby / at Pipri / Korangi
  19. [1] (Advantage) Reliable / continuous power supply
  20. [1] (Factor) Rail / road connection
  21. [1] (Advantage) Ease of transport of raw / heavy / bulky materials / products [especially to HMC at Taxila]
  22. [1] (Factor) Township on site / near Karachi
  23. [1] (Advantage) Readily available supply of labour; Market for sales / exports
  24. [1] Capital intensive
  25. [1] Employed / not self-employed
  26. [1] Mechanised / fewer workers
  27. [1] Regular working hours
  28. [1] Regular / fixed wages
  29. [1] In purpose built factory / office
  30. [1] Legal / registered / pays tax
  31. [1] (Might) Would otherwise be unemployed / unemployed / unemployable find work
  32. [1] (Might) Source of income
  33. [1] (Might) Can afford better diet / improved housing / education / luxuries
  34. [1] (Might) May be suitable for unskilled / illiterate
  35. [1] (Might) Can use traditional skills
  36. [1] (Might) Goods / services available locally
  37. [1] (Might not) Poor working conditions
  38. [1] (Might not) Low / irregular incomes
  39. [1] (Might not) Too many people doing the same thing / too much competition
  40. [1] (Might not) May employ children who do not receive education
  41. [1] (Might not) Goods are poor quality

Write your answer and get it marked

On Oracle Prep you can write or photograph your own answer and have it marked by AI against this mark scheme, with feedback on what you missed.

Sign up free →

About this question

Topic
The environment of Pakistan, O-Level Pakistan Studies (syllabus 2059). Structured question, 25 marks.
Source
O-Level Pakistan Studies, Oct/Nov 2014 Paper 2, question 2.

Questions and mark schemes are from past examination papers and remain the copyright of the exam board. How Oracle Prep builds its content

Related Pakistan Studies questions

© 2026 Oracle Prep