Study Photograph A (Insert) which shows a river bank, where an engineering method has been used to prevent erosion.
- (a)Describe and explain the method used to prevent bank erosion.[5]
- (b)(i)Fig. 4 shows a coastal area. Coastal protection has been used at B to prevent erosion. [Figure 4] For each of A and C, suggest one reason why coastal protection was not thought to be necessary. A C[2]
- (b)(ii)Suggest a group of people who would be against the use of coastal protection at B. Give a reason for your answer. Group Reason[1]
This question uses a diagram from the original paper, which isn't shown here. Open the full paper from the past papers archive to see it.
Mark scheme
Marking points from the official mark scheme (Oct/Nov 2017). The mark or mark type is shown in brackets.
- 3(a) Wood / vertical tree trunks / posts / logs to support the structure; Wire / metal grid / mesh / gabions / cage to contain the stones; Rocks / stones to absorb the water impact / energy; Material / sacking to prevent soil being washed through mesh; Vegetation to anchor soil / reduce saturation; Reserve 1 for explain
- 3(b)(i) A - settlement is inland / no settlement at A; A - cliffs are hard rock; C - sheltered by headland / from prevailing wind; C - shallow water
- 3(b)(ii) Tax payers in another town – why should they pay when it doesn't affect them?; Environmentalists – interferes with habitats / natural processes; Tourists - spoils views / may restrict beach access
Write your answer and get it marked
On Oracle Prep you can write or photograph your own answer and have it marked by AI against this mark scheme, with feedback on what you missed.
Sign up free →