The diagram shows a barrel of weight 1.0 × 10³ N on a frictionless slope inclined at 30° to the horizontal. [Figure 17.1] A force is applied to the barrel to move it up the slope at constant speed. The force is parallel to the slope. What is the work done in moving the barrel a distance of 5.0 m up the slope?
This question uses a diagram from the original paper, which isn't shown here. Open the full paper from the past papers archive to see it.
✓ Correct answer
A: 2.5 × 10³ J
Practise more questions on this topic
Oracle Prep sorts past-paper questions by topic, so you can drill Work, energy and power and see which topics are most likely to come up next.
Sign up free →