Skip to main content
A-LevelMathematicsMechanics9709/42 · Feb/Mar 2022 · Q14 Marks

A crane is used to raise a block of mass 600kg vertically upwards at a constant speed through a height of 15 m. There is a resistance to the motion of the block, which the crane does 10000J of work to overcome.

  1. (a)Find the total work done by the crane.[2]
  2. (b)Given that the average power exerted by the crane is 12.5kW, find the total time for which the block is in motion.[2]

Mark scheme

Marking points from the official mark scheme (Feb/Mar 2022). The mark or mark type is shown in brackets.

  1. [M1] 600g × 15 [= 90 000] (Attempt potential energy.)
  2. [A1] Total work done by crane [90 000 + 10 000 =] 100 000 J
  3. [M1] 100 000 = 12 500 × t (Use of work done = power × time to set up an equation from which t can be found.)
  4. [A1 FT] Time = 8 s (FT on their work done = 100 000)

Write your answer and get it marked

On Oracle Prep you can write or photograph your own answer and have it marked by AI against this mark scheme, with feedback on what you missed.

Sign up free →

About this question

Topic
Mechanics, A-Level Mathematics (syllabus 9709). Structured question, 4 marks.
Source
A-Level Mathematics, Feb/Mar 2022 Paper 4 Variant 2, question 1.

Questions and mark schemes are from past examination papers and remain the copyright of the exam board. How Oracle Prep builds its content

Related Mathematics questions

© 2026 Oracle Prep