Fig. 9.1 shows the dam and reservoir of a hydroelectric power station. [Figure 9.1] A hydroelectric power station uses a renewable energy source.
- (a)State two other renewable energy sources.[2]
- (b)(i)1.When the power station operates at full capacity, the electrical power output is 6.8 × 10⁸W. Calculate the electrical energy output of the power station if it operates at full capacity for one year.[1]
- (b)(i)2.Suggest why, in practice, the power station does not operate at full capacity throughout the year.[1]
- (b)(ii)1.The water surface in the reservoir that supplies the hydroelectric power station is at a vertical height of 170m above the turbines. In one hour, 1.6 × 10¹⁰kg of water flows from the reservoir through the turbines. The gravitational field strength g is 10N/kg. Calculate the gravitational potential energy that is converted into other forms of energy in one hour.[2]
- (b)(ii)2.Calculate the efficiency of the power station when operating at full capacity.[2]
- (b)(ii)3.Suggest two reasons why the efficiency of the power station is less than 1.0 (100%).[2]
- (c)(i)Before the electrical energy is transmitted along power lines, the voltage is increased to a very large value. State and explain why a very high voltage is used to transmit electrical energy over long distances.[3]
- (c)(ii)State the name of the device that is used to increase the voltage.[1]
- (c)(iii)Explain why the generators in the power station must be a.c. (alternating current) generators.[1]
This question uses a diagram from the original paper, which isn't shown here. Open the full paper from the past papers archive to see it.
Mark scheme
Marking points from the official mark scheme (Oct/Nov 2014). The mark or mark type is shown in brackets.
- [2] (a) any two from:
- biomass/wood; geothermal power; solar power; tidal power; wave power; wind power
- [1] (b) (i) 1. 2.1(4) × 10¹⁷ J (allow 2.1(5) × 10¹⁷ J if candidate uses 365.24/5)
- [1] (b) (i) 2. any one from: not enough water (to maintain maximum flow); rainfall varies (during the year); periods of low demand
- [2] (b) (ii) 1. (GPE = ) mgh or 1.6 × 10¹⁰ × 10 × 170
- 2.7(2) × 10¹³ J
- [2] (b) (ii) 2. 2.7(2) × 10¹³/3600 or 6.8 × 10⁸ × 3600 or 6.8 × 10⁸/7.5(55) × 10⁸ or 2.4(48) × 10¹³/2.7(2) × 10¹³
- 0.90 or 90%
- [2] (b) (ii) 3. any two from: friction (of water) with pipe/turbine/; viscosity of water; friction at bearings; resistance/heat in the wires; KE of water leaving turbine
- [3] (c) (i) less energy lost/wasted or more efficient
- (for a given power) a high voltage results in a small(er) current
- less heat generated in wires or I²R or less resistive losses
- (not if changed resistance mentioned)
- [1] (c) (ii) transformer
- [1] (c) (iii) transformers only work with an a.c. supply
Write your answer and get it marked