TBX manufactures high-quality steel which is used to build railways. The method of production used allows TBX to benefit from economies of scale. The business holds a high level of inventory including iron ore. The Managing Director knows business activity could have an impact on the environment and is considering ways the business can contribute to sustainable development.
- (a)Identify two ways business activity could have an impact on the environment. Way 1: Way 2:[2]
- (b)Identify two ways a business could contribute to sustainable development. Way 1: Way 2:[2]
- (c)Outline two possible economies of scale TBX might benefit from. Economy of scale 1: Economy of scale 2:[4]
- (d)Explain two possible problems for TBX of holding a high level of inventory. Problem 1: Explanation: Problem 2: Explanation:[6]
- (e)Do you think quality control is the best method for a manufacturing business to use to achieve quality production? Justify your answer.[6]
Mark scheme
Marking points from the official mark scheme (Oct/Nov 2023). The mark or mark type is shown in brackets.
- [2] Award 1 mark per way (max 2).
- Points might include:
- Pollution (or examples e.g. noise, air)/global warming/emission of greenhouse gases
- Congestion/transport of goods
- Energy use/use fossil fuels
- Land use/use up natural resources/deforestation
- Waste (disposal)/use single use/non-renewable/non-recyclable materials
- Other appropriate responses should be credited.
- [2] Award 1 mark per way (max 2).
- Points might include:
- Reduce amount/number of resources used
- Reduce number of products made/level of output
- Reduce waste
- Reuse products/materials
- Recycle products/materials
- Use renewable energy
- Develop environmentally friendly products
- Use environmentally friendly production methods/sustainable materials
- Use environmentally friendly/sustainable packaging
- Replant trees
- Use electric vehicles
- Other appropriate responses should be credited.
- [4] Award 1 mark for each relevant economy of scale (max 2).
- Award 1 mark for each relevant reference to this business (max 2).
- Points might include:
- Purchasing (economy) for the iron ore
- Technical (economy) to manufacture steel
- Managerial (economy) helping contribute to sustainable development
- Financial (economy) so can have a high level of inventory
- Marketing (economy)
- Other appropriate responses should be credited.
- [6] Award 1 mark for each relevant problem (max 2).
- Award 1 mark for each relevant reference to this business (max 2).
- Award 1 mark for each relevant explanation (max 2).
- Points might include:
- Rent/storage space/large space needed for the steel which can increase fixed costs/expenses
- Ties up working capital such as iron ore which could lead to liquidity/cash flow problems/difficult to pay suppliers
- Insurance costs which increase cash outflows so less funds to contribute to sustainable development
- Opportunity cost/funds could be used for other purposes
- Risk of damage/theft/wastage/product could rust leading to higher costs
- Other appropriate responses should be credited.
- [6] Award up to 2 marks for identification of relevant points.
- Award up to 2 marks for relevant development of points.
- Award up to 2 marks for a justified decision as to whether quality control is the best way for a manufacturing business to use to achieve quality production.
- Points might include:
- Quality control (QC):
- Tries to eliminate/lower chance of faults before products reaches customer to help maintain reputation
- Does not stop production while checking so some output is available
- Need to recruit inspectors which increases labour costs
- Spots errors at end/does not show where error happened in process which could increase wastage
- Other method is:
- Quality assurance (QA)
- Errors stopped before happen/spotted earlier in process/products checked throughout so less funds/time spent on rework
- Increase employee motivation leading to higher output
- Need to train all employees which increases (fixed) costs
- Not all workers interested/able to spot problems
- Other appropriate responses should be credited.
- Justification might include:
- With quality control, production workers do not need extra training so no increase in costs. Another method is quality assurance which means mistakes are spotted sooner in the process. Quality assurance is the best way because fewer mistakes is likely to mean fewer resources are wasted and the funds saved should hopefully cover the additional cost of training.
Write your answer and get it marked
On Oracle Prep you can write or photograph your own answer and have it marked by AI against this mark scheme, with feedback on what you missed.
Sign up free →