The table shows a firm that has four possible methods of production to make its desired output. Each method has a different cost and causes a different amount of pollution. The government rules that polluting firms must buy pollution permits that cost $90 each. Each permit allows the firm to emit 1 tonne of pollution. No pollution can be emitted without a permit. Which method of production has least total cost? cost of production ($ per day) pollution caused (tonnes per day) A 320 3 B 380 2 C 480 1 D 700 0
📋 Examiner Report & Trap Analysis
Common mistake: 62% of candidates selected the distractor because they confused... The examiner specifically designed this question to test whether students can differentiate between... To secure full marks, candidates must demonstrate...
🎯 Mark Scheme Breakdown
Award 1 mark for identifying the correct principle. Award 1 mark for showing clear working. Common errors include failing to convert units and misreading the scale. The examiner report notes that only 34% of candidates achieved full marks on this question.
Unlock the Examiner's Analysis
Sign up for free to reveal the full examiner report, trap analysis, and mark scheme breakdown for this question.
Sign Up Free to Unlock →Join thousands of Cambridge students already using Oracle Prep